COMAC C919 deliveries, production & order book

Text version of the COMAC data on this page

COMAC data snapshot

  • Scope: C919 deliveries; COMAC is state-owned and unlisted
  • Headquarters: Shanghai, China
  • Segment: C919 narrowbody · C909 regional jet
  • Financial year end: 31 Dec
  • Reporting currency: Not published
  • Latest period: Q1 2026
  • Last updated: 2026-09-24

Latest read

COMAC's order book is large and its output is not. About 35 C919s have been delivered since December 2022, including 13 in each of 2024 and 2025, and three in the first quarter of 2026. At one aircraft every 10–15 days, the programme is running at two to three a month against a stated capacity of 100 a year.

Reported metrics by year

PeriodDeliveriesBacklog
202513—
202413—
Q1 202631,000+

Guidance versus actual

YearMetricGuidedActualNote
FY2025C919 deliveries2513Revised target reported by industry sources
FY2026C919 deliveries33—Chinese airlines' expectation; COMAC states capacity of 100

C919 deliveries by year

YearDeliveriesNote
2022–2023~6First delivery to China Eastern, December 2022
202413—
202513Against a revised target of 25
Q1 20263Two China Southern, one Air China

Stated capacity versus forecasts

YearCOMAC stated capacityIBA forecastAirline expectation
2026100~2833
2027–202815059 (2028)—
2029200——
2030—93—

Programme status

ProgrammeTypeStatusEngine
C919Single-aisle, ~160–190 seatsIn service with China Eastern, China Southern and Air ChinaCFM LEAP-1C
C909Regional jet, ~90 seats186 delivered to end-March 2026; exported to several Asian operatorsGE CF34-10A
C929Widebody, 280–440 seatsDetailed design; Air China launch customer; service entry targeted early 2030sNot selected

Capacity claims versus deliveries

COMAC has stated capacity of 100 C919s in 2026, rising to 150 and then 200 a year. Independent forecasts are far lower: IBA expects about 28 in 2026 and 59 in 2028, and Chinese airlines expect 33 this year.

Western engines and certification limit the market

Both in-production aircraft use US engines (CFM LEAP-1C on the C919, GE CF34-10A on the C909). The domestic CJ-1000A is not expected to be certified before 2027–28, and EASA validation of the C919 is not expected before 2028–2031, which keeps sales largely domestic this decade.

Outlook

What to watch in 2026: Whether C919 output moves beyond two to three aircraft a month.

  • Engines: dependence on US-made LEAP-1C and CF34 engines, with the CJ-1000A not certified before 2027–28.
  • Assembly throughput: roughly one C919 every 10–15 days.
  • Certification: EASA validation not expected before 2028–2031.

Peers

  • Airbus — A320neo competes with the C919
  • Boeing — 737 MAX competes with the C919
  • Embraer — E-Jets compete with the C909

Related analysis

Sources

Aviation Intelligence Database · Manufacturer profile

Manufacturer profile

Company-reported deliveries, orders, backlog, production rates and financial results from 2018 to the latest published period.

11 core metrics — Updated — Next results —

At a glance

Latest reported period

Metrics

Full-year history

RReportedDirect company disclosure CCalculatedDerived from company figures GGroup-levelIncludes non-commercial divisions DCompany-definedNon-standard measure —Not disclosedNo estimate inserted

Analysis

What the numbers say

More detail

Additional disclosures

Guidance vs actual

Did the manufacturer deliver?

What management guided at the start of each year compared with what was reported. Within about 1% of a point target, or inside a range, counts as met. Mid-year revisions are shown in the notes; outcomes are judged against the original guidance.

Programmes

Programmes & production rates

Airline customers

Airlines on this site that fly or order its aircraft

Key events

What moved the numbers

Peers

Compare with other manufacturers

FAQ

Frequently asked questions

Methodology

How to read this page

Every figure keeps the company’s own reporting period, currency, entity scope and terminology. Unit figures (deliveries, orders, backlog) cover commercial aircraft; financial figures are for the whole group unless marked otherwise. Missing figures are not estimated.

  1. Years are the company’s financial years; the exact period end is shown in the first row, with a link to the source where available.
  2. Latest is the most recent interim period. YoY compares it with the same period a year earlier.
  3. Book-to-bill is net orders ÷ deliveries. Above 1.0× the backlog is growing.
  4. Backlog cover is period-end backlog ÷ deliveries in the latest full year: how many years of output the order book represents at the current pace.
  5. Average monthly rate is deliveries ÷ months in the period. It is a delivery pace, not the production rate the company states.
  6. Sources: annual and interim results, monthly orders-and-deliveries releases. See Data & Research.